2mm A tale of two signalboxes

David Varley

Western Thunderer
I fell lucky with the glazing in that I was able to do most of the windows with whole cover slips - only had to cut them for the door and the small windows at the top of the ends.

With the back wall fixed in position a basic roof was affixed and there things rest - tomorrow I'm hoping to start adding the roof detailing and make a start on the tiling.

IMG_1757_zpscsmlmxyn.jpg IMG_1758_zpshl1slm2o.jpg IMG_1759_zpsbobh7pjg.jpg
 

David Varley

Western Thunderer
OK ... this thread is entitled "A tale of two signalboxes", so where's the other one?

Well, one of the main reasons for building Lightcliffe 'box (apart from it being needed for the Pennine Group's layout of course) was to encourage me to finish off my model of Coniston 'box which had been kicking around in one form or other for over three years.

It did make an appearance earlier in the thread, but at that time was still just a collection of parts ... but now it's just about finished and as with Lightcliffe just awaits the addition of some nameplates.

IMG_2142_zpsgvxcrnpk.jpg

IMG_2143_zps1rgxuer8.jpg

IMG_2144_zpsnrejc5ot.jpg

IMG_2145_zpsolszejzj.jpg
 
Top