A Dapol B-set for coach....A gift as well! I like the look of them so much in lined maroon that I altered the period of the layout to suit 'em! I was aiming to keep left of 1955 before they arrived....A coach, for the Coach!
as an on-line order takes at least 5 working days to arrive
Back in the early 1960's I was surrounded by model shops, but had precious little time to do any modelling. Today, I have all the time in the world but lots of 'downtime' while awaiting materials.
At least there is somewhere to sit while waiting.....
View attachment 111356 View attachment 111357
I think I showed how it can done earlier in the thread. There is separate super-elevation for Up and down tracks on my latest layout, but previously (in 4mm/00) I had both tracks on the same cambered cork base.Larry the shots above really show the rails at their best. I'm now looking at ways to the super elevation on my layout.
Replacing the errant point would have been done by now, but like you say, on-line orders can take some time to be delivered.The layout becomes more atmospheric by the day!
I do find parallels with this in modelling, particularly as an on-line order takes at least 5 working days to arrive. By then I have moved on to another project. Which is why I seem to have too many projects on the go.