28ten
Guv'nor
Easy......
Top priority finishing jobs
D1000 should be done very early in the new year
The Bank which just needs a few final bits gluing and paint
Lambourn Station, 'box and shed.
Tilly
Medium term jobs
SE5a
8 JLTRT Mk1 which if I hadnt been sidetracked by details would have been finished by now
Buildings - lots of
1/32 Warship
Do a job on the Heljan Hymek
Long term
I fancy doing a Castle or a King
MSWjR 2-4-0
1/32 mk1's
I totally reserve the right to drop everything and do something I fancy in a different scale/gauge/genre
Top priority finishing jobs
D1000 should be done very early in the new year
The Bank which just needs a few final bits gluing and paint
Lambourn Station, 'box and shed.
Tilly
Medium term jobs
SE5a
8 JLTRT Mk1 which if I hadnt been sidetracked by details would have been finished by now
Buildings - lots of
1/32 Warship
Do a job on the Heljan Hymek
Long term
I fancy doing a Castle or a King
MSWjR 2-4-0
1/32 mk1's
I totally reserve the right to drop everything and do something I fancy in a different scale/gauge/genre