Browse by: Authors | Issues | Compendiums | Tags
2 results found for 'John Thompson'
-
A Signal for Port Solway
Issue 280 (2020)
p.169
4mm
John Thompson explains how he built this complex bracket signal for the Newcastle club's 4mm NER layout
-
Lowburn Park
Issue 198 (2010)
p.93
4mm/P4
Authentic operation is a key feature of John Thompson's P4 Pre-Grouping NER layout Lowburn Park. Here he describes the layout and, in a series of detailed captions, a typical operating sequence.