7mm MOK 8F - 8425

Rob Pulham

Western Thunderer
Having got the steam pipes in, I decided to work my way down one side at a time with the detailing. The vacuum ejector looked like it was going to be fun so yesterday I made start on that.

55274274692_7fa98c609a_h.jpg

The elbow casting is provided in the kit but no provision is made for the small pipe and it's connector nut that comes out of the bottom of the elbow. A 0.4mm hole was drilled and some 28 gauge brass beading wire soldered in. With a slice of tube filed to a hex to represent the nut.

Then came the pipe clamps. There isn't any provision for this in the kit so I made some 'split pins' from 0.8mm half round brass wire and another slice of slightly thicker tube to create the flange.

55275588220_f716c62b2d_h.jpg

Next is the ejector itself. The casting as you might expect comes devoid of pipework so more 0.4mm holes ensued pipes again made from 28 gauge beading wire and another length of microbore tube. This was cross drilled on one side to take the vertical pipes. I still need to drill the thicker down pipe to accept the horizontal pipe but first I need to make sure that it fits to the footplate and is bent in the right planes. There is also another pipe to fit to the rear of the ejector casting that goes into the cab.
 

Dave Holt

Western Thunderer
Rob.
Do not drill the vacuum down pipe. The small bore drain pipe is clipped to the back side of the larger pipe, it does not connect to it.
Nice work with the drain pipes so far.
Dave.
 

Rob Pulham

Western Thunderer
Rob.
Do not drill the vacuum down pipe. The small bore drain pipe is clipped to the back side of the larger pipe, it does not connect to it.
Nice work with the drain pipes so far.
Dave.

Excellent, thanks Dave, that's just made this afternoon's job a whole lot easier.
 

Rob Pulham

Western Thunderer
Thanks to Dave's timely reply, my life was made so much easier when he said that the smaller pipe didn't actually feed into the down vacuum pipe but was clipped to the back of it. This saved another delicate 0.4mm drilling job.

55274919997_1d9eb15549_h.jpg

55274920002_23ba74c84c_h.jpg

55276066259_2632f61ad7_h.jpg

It's not exactly clipped, but it's out of sight behind the vacuum pipe when fitted so well hidden.

The observant amongst you will note, that the small pipe at the smokbox end was a casualty of my ministrations. So that will need reattaching.

Also, since the photos were taken I have shortened the union at the rear of the vacuum ejector which holds the pipe that goes into the cab. It's now more 'nut' like... Plus I've cleaned up much of the excess solder even though it's out of sight.
 

Rob Pulham

Western Thunderer
I seem to have missed a step or too in progress updates so this is to address those and bring the thread up to date.

In another of those mental build up moments I had imagined that the sandbox shields might be a bit difficult to get the pipes and holes in the right orientation. When it came to it, all my elaborate thoughts about milling oval slits etc. came to naught, as I drilled the right sized hole and then used a round file to chamfer the top and bottom edges while holding it it roughly the right angle that it would sit on the footplate and they were done. I did make a couple of minor adjustments to one of them but I got the rest soldering in right first time.

55273340568_c88e4e3f6b_h.jpg

55273340548_44acbda8b4_h.jpg

The etched shields as can be seen from the rear ones came without provision for a top lip but I soon made some up from scrap etch to fill the rather wide gap where the boiler tapers. I found a small piece which was just the right width so it was just a case of putting a right angle bend and then chopping it off on the guillotine.

55274479427_8f1778a64b_h.jpg
 

Rob Pulham

Western Thunderer
Still working away at adding details to the left hand side of the loco (although, I have added the solid blocks to the base of the firebox on either side).

After much fiddling to get the vacuum ejector pipe to sit horizontal I got there and it's now fixed in place. As happens sometimes. I spent some time making the very visible pipe flanges that are fitted to the lower section of the vacuum pipe just above the footplate.

55284907189_ffb4501355_h.jpg

The best of these were soldered together in pairs and one pair fitted to the pipe. Then of course I discovered a pair of nice castings on a spru so my homemade ones are consigned to the spares box for now.

It was also kindly and discretely, pointed out that I had the dome on back to front. Which, was accompanied by a clear explanation of why it was thought to be so. As I read it, it made perfect sense and I could see clearly why it was on back to front. Life got in the way and I was unable to do anything in the workshop on Wednesday but I awoke early yesterday with my mind working on how I might safely remove the dome. I'd run elaborate scenarios of using the microflame while wrapping vulnerable bits in wet tissue ad using various items as heat sinks etc.

When I got into the workshop after breakfast I looked and realised that although I had fixed the boiler in place and removing it although not impossible would require undoing and refitting a number of parts. I could in fact get my low melt soldering iron into the base of the dome via the opening in the base of the firebox.

Then it was a relatively simple matter of starting to ease it off with my nails while heating the underside with the iron then once i had it move enough I used a pair of wooden coffee stirrers as pry bars to ease it off the rest of the way without damaging either the casting or the boiler. it was one of those situations where another couple f hands would have been helpful but I managed.

Oh what a few years of experience brings. Back when I started this build, if someone had told me then that I had the dome on the wrong way around. I would never have had the courage to remove and refit the dome and at that point the boiler was a separate entity.

55285124635_5b014eb08e_h.jpg

As a small side note not long after the Finney7 team took over the range I bought a set of etched pipe clips (a side product from the Duchess kit) and this is the first time I've remembered to use them. Of course as soon as I touched the first one after thinking it was fixed in place, it pinged off, never to be seen again.

55283803177_bf17aa4956_h.jpg
 

Rob Pulham

Western Thunderer
The last few days have been all about oil boxes.

Studying photos shows that there are quite a number of 2 port oil boxes dotted about the footplate and visible inside the upper frames. There were some castings provided but there were only four of them and they lack mounting plates. While I could and did make mounting plates I also elected to remake the oil boxes with a bit more detail.

55294421939_7a183c9c8b_b.jpg

Besides to large 6/8 port lubricators mounton the the right hand side there seem to be three different types of 2 port lubricators so i have replicated each type as best I can.

The types that I have identified (so far) are:

Rear mounted with pipes coming out of the bottom.

55288666734_1d584ff81a_h.jpg

Bottom Mounted presumably with the pipes also coming out of the bottom, but I haven't modelled them.

55291250292_92524b6ffc_h.jpg

The last type are those mounted at the front of the frames just under the end of the smokebox. These are very shallow and have a couple of prominent mounting nuts on top of the angle iron mounting plate.

55292718701_70749dfa3d_h.jpg

55294372394_2b85fe9714_h.jpg

What can't really be seen in the photos is that back edge of the angle plate also has two holes and after struggling to workout how I might hold all the other parts together while I added the last two mounting bolts (the brass angle doesn't take pressed rivets very well due to the proximity of the other leg) I elected to use the holes to drill the frames and then pass brass pins through to mount them.

After doing the initial rear mounted boxes with 180 degree solder it occurred to me, that I would make life much easier, if I soldered the others together using 296 degree solder. Thus making it less likely that they would fall apart if soldered to the frames with 145 degree solder. time will tell.
 

Rob Pulham

Western Thunderer
Ian Allen, fellow Guild member and font of knowledge for all things LMS kindly pointed out that the cladding band on the firebox only had the bottom four or five fixings, so the rest need filing off the firebox casting. He posted a photo showing his example and wile looking at it it reminded me that I still needed to do something with the washout plugs. I knew that I needed to do them but seemed to keep overlooking them as I progressed with detailing. So yesterday I got stuck in and made some.

My initial attempts were with a collet block but they came out asymmetrical and I couldn't understand why so I fitted the spin indexer to the mill and tried again. it was at the point that I realised that my bit of brass rod was bent - this particular piece of rod has caught me out before...

I checked stock and found a piece of similar sized (3mm) nickel rod and tried again. All was well so I got stuck in and set up a mini production run and a couple of hours later I had enough for this loco plus a few spares.

55297705122_1df2bf61c6_b.jpg

They are designed to be soldered in from the inside. So the next job is to drill out all the holes and fit them before starting to fit all the oil boxes.
 

Rob Pulham

Western Thunderer
Thanks Mike, the more I learn, the more they are growing on me.

Although predominantly an LNER modeller, I do have another two or three LMS engines in the pile.
 
Top