Hi Rob. I've got the windows and doors to do in the office block and the surrounding blue needs another coat of paint. Also, I've got to paint the concrete parts (any help with colour suggestions would be most appreciated, because the Railmatch 'Concrete' is far too green and I need to find something else!). Then there's the front of the shed, since most of the left half is just leaning together and isn't actually joined up yet. Then that needs painting too. I need to put oil stains in the 4 foot as well. I've been very restrained (for me) and stuck to having only one loco and the depot itself as work in progress. 1611 is complete and 7070 is almost done, except for the numbers on one side and the hoses at No.1 end. When that's done, I'm probably going to attack my other Hymek. As soon as the outside of the shed's complete, It'll be the ionside of the shed next. Graeme