A little more polystyrene shaping on the Holloway tunnel end of Devonshire Bank.
The section of ply marked in the front will be cut out and lowered 10” or so. This is where the stone retaining wall will be, the culvert and stream. That will be done later on as once the section has been cut out it will make track laying easier.
I’ve also been thickening the foliage on the largest of my home made trees and giving it some additional green cover ( I may reduce the trunk height a bit on this one ) I do want a big tree here but I’m not sure it’ll be this one. I may get a large Oak from MBR. The Italian poplar and Scott’s pine are from their range as are the smaller Birch.