An escape hole for point rodding etc has been dug beneath the signalbox. A short section of platform was removed and the work carried out indoors...
During this process the platform was shortened by 4 inches. A key tool used when erecting fencing etc is a set-square from a Christmas cracker...
Steps down to the goods shed were added along with GWR spear fencing (Ratio 434). The post was made from sprue...
The station buildings were moved back closer to the buffer stops earlier in the week. This area has been patched up ready for fencing and hedgerow etc...