Developments on Norwood Road took a significant step forward with the delivery of the coaling stage.

Built by David Amias and based upon the facility at Three Bridges shed it fitted exactly in the space I had mapped out for it. Then I realised I had not made any provision for clearance alongside to coaling dock under the roof. Entirely my mistake! The stage is now 10mm narrower that first constructed, locos do pass successfully and I could breath again.
Thoughts now turn to future developments. The water column shown lower left is always in the way whenever I take stock shots. To move it to the other end of the pit would be un-prototypical for a Southern shed. I've decided that once the brickwork is weathered in, a very low "bung", maybe just a bucket, can be put over the hole for the peg of the column so unrestricted photos can be easily taken.
A small diesel fuelling point will be installed just off the turntable. I plan something similar to that provided at Norwood Junction shed which just consisted of a siding for the tank wagon, a holding tank/reservoir and a pump and a small building.