West Mersea
Great day at West Mersea Hq today, and thankyou for all the visitors. We had 4 new visitors, and 1 person who had attended before amongst the usual suspects. I hope all had a good day, and worthy of the travel, though apologies that there are still one or two niggling little problems that might have marred the day if only slightly.
I did though hear one person when asked what time they wanted to leave reply with the phrase "tomorrow..??!!" which is good to hear.
It was a day of firsts for the group and layout... Shunting of wagons in the yard, two trains passing each other on the extension, a proper passenger service travelling back and forth to the traverser and turntable in 'the other room', so a relatively successful day!!
K2 had a good run, and surprisingly, the J68 performed faultlessly, and probably travelled 10 times further today than it has since it was built
Amongst Easterner and Alan visiting with a third friend (sorry I was so hectic running around I didn't catch their name), we had 7mmMick from ooop norf who brought his two brake vans and LNER tube wagon, which despite their length which could have caused issues, ran absolutely perfectly out of the box as it were, so many congratulations to him, should be very proud of that, and look forward to seeing the G5 in very due course !!
With Mick's two brake vans, and the 4 that we already have on the layout, it seemed rude not to mock up a LCGB brake van special see pics... a couple of videos of the days activities too. I'd like to have shot a lot more video material, but it just wasn't possible, whilst trying to make sure everything was running as best it could.