FJ1701
Member
Hello there, after designing and building many layout which have been subsequently dismantled, I thought I would give it another try and here I am with a fresh start. After returning to the hobby only about a month ago, I started drawing up plans on what would become a southern region terminus but with my limited time restraints, I started looking to buy ready built layouts without any scenery to save me hours of time and I finally struck gold.
After browsing ebay and various other sites for a layout, I found this terminus station with track laid and all the wiring complete. It came fitted with point motors and the baseboards had a solid construction in mind for transporting to exhibitions which is just what I wanted. After winning the auction, I brought it home and here I am creating this thread ready to this journey showcasing the progress of my new layout. Now enough of the introduction!
A map showing West Wittering in relevance to Chichester.
The plan:
A southern region terminus based below Chichester on a fictional branch line to West Wittering, note the railway did reach Selsy to the East but in the form of a light railway which had plans to reach West Wittering but never came to fruition. The railway will be based between 2015 - present which will allows me to take advantage of the beautiful new GWR livery. The franchises currently operating through Chichester station are Southern and Great Western Railway however South West Trains ceased services in 2007. Hold on a moment, I've changed my mind, I will now be modelling 2004 which is the transition period between slam door and modern rolling stock. This means I have access to a larger variety of units such as the 421's and the 423's in South Central, South West Trains and Network South East which still appeared across the network whilst also having access the the class 159'2, 450's and class 377's. Whilst looking over my layout and it's track-plan, I was thinking to myself that there was too much track and how Network rail would have streamlined it perhaps removing the sidings and a platform so I decided to bring the layout back a decade to a more realistic era for the track plan I currently have. Many thanks.
Freight services from Merehead and Whatley quarry's run to Chichester with the local stone train which is emptied in Chichester yard but the locomotives could be housed in a depot next to West Wittering station.
RoryTrack/track plan: The layout will use code 75 track but the spacing of the sleepers will be altered to achieve a prototypical and aesthetically pleasing look. This has already been carried out by the original owner however I will continue his work on the extension. Below is the current track configuration as seen before any alterations:
Thank-you and I hope you enjoy!
Rory
After browsing ebay and various other sites for a layout, I found this terminus station with track laid and all the wiring complete. It came fitted with point motors and the baseboards had a solid construction in mind for transporting to exhibitions which is just what I wanted. After winning the auction, I brought it home and here I am creating this thread ready to this journey showcasing the progress of my new layout. Now enough of the introduction!
A map showing West Wittering in relevance to Chichester.
The plan:
A southern region terminus based below Chichester on a fictional branch line to West Wittering, note the railway did reach Selsy to the East but in the form of a light railway which had plans to reach West Wittering but never came to fruition. The railway will be based between 2015 - present which will allows me to take advantage of the beautiful new GWR livery. The franchises currently operating through Chichester station are Southern and Great Western Railway however South West Trains ceased services in 2007. Hold on a moment, I've changed my mind, I will now be modelling 2004 which is the transition period between slam door and modern rolling stock. This means I have access to a larger variety of units such as the 421's and the 423's in South Central, South West Trains and Network South East which still appeared across the network whilst also having access the the class 159'2, 450's and class 377's. Whilst looking over my layout and it's track-plan, I was thinking to myself that there was too much track and how Network rail would have streamlined it perhaps removing the sidings and a platform so I decided to bring the layout back a decade to a more realistic era for the track plan I currently have. Many thanks.
Freight services from Merehead and Whatley quarry's run to Chichester with the local stone train which is emptied in Chichester yard but the locomotives could be housed in a depot next to West Wittering station.
RoryTrack/track plan: The layout will use code 75 track but the spacing of the sleepers will be altered to achieve a prototypical and aesthetically pleasing look. This has already been carried out by the original owner however I will continue his work on the extension. Below is the current track configuration as seen before any alterations:
Thank-you and I hope you enjoy!
Rory
Last edited: