JohnnySpanners
New Member
I’ve been tinkering with TT long enough without a layout so now I have moved into my new house I’m building the first of two baseboards, this is the scenic one and the other is for a fiddle yard of sorts.
Currently planning out where and what, but I am happy with the layout so far and whilst I unpack more track I can finalise the design. TTn9 is being laid to represent 3ft gauge alongside the standard gauge, the rear scenic break may house a small back and forth tramway as I built a TTn9 tram a few years ago.

All track so far is Hornby bar one set of Peco points, I forgot how long it takes to build a layout and even then is it ever finished? At least the first trains have ran using a 9v battery
Currently planning out where and what, but I am happy with the layout so far and whilst I unpack more track I can finalise the design. TTn9 is being laid to represent 3ft gauge alongside the standard gauge, the rear scenic break may house a small back and forth tramway as I built a TTn9 tram a few years ago.

All track so far is Hornby bar one set of Peco points, I forgot how long it takes to build a layout and even then is it ever finished? At least the first trains have ran using a 9v battery