Buckjumper
Flying Squad
Adrian, just do this one, now, and the rest shall be as good as done.
Et tu, Brute?
Adrian, just do this one, now, and the rest shall be as good as done.
- finish something
- learn something
- and have fun
I'm taking the same tack as Rob - Like last year be nice and vague. So my projects are
As long as I manage 2 out of the 3 then I'll be happy.
- finish something
- learn something
- and have fun
In Blue eh! When did anyone last see a British Rail Universal Trolley Equipment (Experiment?) in use with parcels / sacks? Or had to dodge the electric tug as the Brutes snaked along the platform?Et tu, Brute?
Of the two S7 projects, I suspect that the Sentinel might get started first, as that doesn't require much in the way of complicated drivetrains or suspension!
Which Sentinel are you looking at? I've had a couple of ideas for building another one at some point. [Rob got there before me!]Of the two S7 projects, I suspect that the Sentinel might get started first, as that doesn't require much in the way of complicated drivetrains or suspension!
Rob/Adrian - it's the Judith Edge one:
http://www.ukmodelshops.co.uk/judithedge/kit/117
(possibly not the kind of Sentinel you were thinking of )
Ditto!!I suspect it's not the 06 that you may think
I have Steve, but I suspect it's not the 06 that you may think - it's an LNER 06 (LMS 8F)
http://www.westernthunder.co.uk/index.php?threads/lner-06-mok-8f-build.869/
It's going to be a busy year :scratch:
1/ Move to new house (nearly packed and ready to go) !!! Yes, all moved in.
2/ Take over the double garage for my use only 8) Yes it's all mine
3/ Persuade her indoors that it will be fine if I can just run a single line along the back wall of the dining room. This will enable me to run from the garage directly though and out into the garden, surely not a lot to ask SWMBO said not in a 1000 years !!
4/ Finish off my jltrt 42xx. Yes, done.
5/ Build Finney 28xx ( only been waitting 2 years to get started :scratch: Still to do.
6/ Build all the rolling stock that has been gathering dust since 2003 Getting there, slowly.
7/ Then finally build the layout to run it on !!! Still to do.
8/ Ho and in between install new central heating for the house (and garage 8)), and dig a pond.£7,000 later central heating installed, pond still to do.
Maybe I have taken to much on, ask me in a years time
ATB, Martyn.