Did'nt take any pics of progress but the Invertrain levers came, very nice castings in whitemetal and at ?5.50 for 20 not bad price. (springside do a interior kit with signal equipment and 30 levers at ?30) But as Penzance has 75 levers i wont be going down that road
. I have got to ask my mate at our railway club about the track layout/points/lever set-up(he is a signalman at Shirebrook Box)
. I have finished building the roof which i am very happy with
, just needs painting. I finally went for the slaters sheets of tiles. I was suprised how far they went. The roof only took 1 and a bit sheets
The list of jobs to do on the box is small now.
1. Paint roof
2. Finish off levers/signal equipment
3. Add couple of chairs( one an arm chair)
4. Add Penzance Signal Box sign. (still to get letters)
5. Put lights in.
6. Finish weathering.
And of course 7. add Signalman.
Will try and get some pics took asap.
Rob :wave: