Browse by: Authors | Issues | Compendiums | Tags
12 results found for 'David Jenkinson'
-
Maunsell Corridor Coaches in 7mm
Issue 96 (1997)
p.166
7mm
A review of Slater's new SR corridor coach kit.
-
Return to Kendall
Issue 122 (2000)
p.263
7mm
In the first of occasional return visits, David Jenkinson brings us a little more up to date with his ongoing 7mm project.
-
Return to Kendall - Part Two
Issue 124 (2001)
p.17
7mm
David Jenkinson now takes us on the practicalities of bringing his huge 7mm project to life with the construction and installation of buildings plus some fundamental scenic decoration.
-
The Last Great Project
Issue 99 (1997)
p.302
7mm
David Jenkinson gets to work on his 7mm layout.
Part 5. Baseboard construction and tracklaying.
-
The Last Great Project
Issue 106 (1998)
p.267
7mm
The Kendal Branch is running, and David Jenkinson explains how it works.
-
The Last Great Project - Part 1
Issue 85 (1996)
p.43
7mm
This 7mm model of the Kendal Branch is intended to keep David Jenkinson happy in his retirement.
-
The Last Great Project - Part 2
Issue 86 (1996)
p.107
7mm
David Jenkinson continues the description of his retirement project.
-
The Last Great Project - Part 3
Issue 88 (1996)
p.189
7mm
Planning for authentic operation.
-
The Last Great Project - Part 4
Issue 92 (1997)
p.19
7mm
The crucial research
-
The Non-Corridor Project
Issue 15 (1987)
p.168
The prototypes of MRJ's project layout passenger stock described by David Jenkinson.
1940s LMS non-corridor coaching stock.