
Surgery
Reconstruction (weight added to concrete slabs)
Slab mods
Stepbboard brackets
Weight added and Vac equipment
Brakes, axle guards, J hangers, surgery for compensation units (late change of mind)

Ducket detail. Majority of the rivets removed and the vertical planking extended to the edge of the ducket. Some tidying to do.
second stepboards







Re the BR brake van, there were three different versions with regard to braking..
Unfitted
Through pipe and gauge only
Piped with gauge and vacuum brake handle
And the astragal bars in the end windows and doors relate to these different versions too, though without looking properly I couldn't tell you which is which.
JB.

Certainly looks like it to me..Is this a photo of the latter option?
http://yorkareagroup.co.uk/wp-content/gallery/lner-brake-van-246710/bv_interior.jpg
View attachment 53264
Steady now. You'll have things finished before you know where you are!
The Maunsell will look lovely in the lined green.
It is all coming on rather nicely.
It may well be worth checking out Railtec transfers.
How about Camhridge Cudtom Transfers? John certainly does the full suite of CCT and PMVs (including the plastic ones) and, I think, coach set numbers in 7mm. You'll end up with a few spares but that shouldn't pose too much of a problem.
Adam
PS - I've had a custom job queued with Railtec for the better part of a year now, must chase them...
I do like CCT stuff, used them a lot in 4mm previously. Cambridge Custom Transfers
"Sheet S1 - This covers ALL of the kits in the Parkside 4mm. scale range which are appropriate to the BR Nationalisation to mid 60's period.
We use essential cookies to make this site work, and optional cookies to enhance your experience.