) as I don't have anything suitable in stock. I've done a lot of kit bashing and adapting over the years, but never set out to build something from scratch in metal; so it will be a first for me.Phil, it is probably laziness. Sweating the strips on would require tinning one or both surfaces before positioning the strip, or using solder paste. Both do work well. The way I do it, the strips are positioned dry the the liquid flux is applied and the capillary action draws it under the strip. When the solder is applied to the side of the strip the solder is drawn under the strip by the flux and I leave the iron in place until the solder is just visible on the other side of the strip, so the end result is the same. I do have to do some cleaning up but it is literally a stroke or two with the fibreglass pencil. Try different methods and do what suits you.Overseer - I see that you don't 'sweat' the riveted overlays in place, any reason for that?
Phil
Phil, it is probably laziness. Sweating the strips on would require tinning one or both surfaces before positioning the strip, or using solder paste. Both do work well. The way I do it, the strips are positioned dry the the liquid flux is applied and the capillary action draws it under the strip. When the solder is applied to the side of the strip the solder is drawn under the strip by the flux and I leave the iron in place until the solder is just visible on the other side of the strip, so the end result is the same. I do have to do some cleaning up but it is literally a stroke or two with the fibreglass pencil. Try different methods and do what suits you.



















Awesome accuracy and square'ness (not sure if that is a proper word??) in marking and cutting!
Really enjoying this thread.![]()
I have just been looking at Paul Bartlett's photos again and think I might have missed some rivets off the end door, and the associated vertical strips on the inside. See http://paulbartlett.zenfolio.com/steelmineral/h13fc24c1#h1c8d5d70 . It looks like this one has three vertical rows of 5 rivets, one in the centre and one each side. Not sure if this is a modification to the door hinge arrangement or not. I think I will leave mine as it is but anyone else building a Butterley wagon might like to add the extra rivets and strips. 15 more rivets.......
Hi Susie,Hi Fraser,
I'm finding this all very inspiring. Thank you for all the work you're doing to get us to scratchbuild!
Could you please clarify something for me regarding the flat, rivetted strips at either end of the sides? At the fixed end, are they part of an angle section round the corner to hold that end together? At the door end, is it just a doubler to give some rigidity, or another angle to act as a door stop?
Many thanks,
Susie
Mick, I don't recall the Modellers Backtrack article amongst my very incomplete and random collection of MB so a copy will be very useful.
We use essential cookies to make this site work, and optional cookies to enhance your experience.