Hi,
The sun has come out briefly, so I was able to take some pics of yesterday's progress.
Firstly the first point of the crossover was laid, filling the gap in this area. The gap on the inside circuit is now the only gap to be filled to give us two continuous runs.
and this gives an idea of the flow through the pointwork:
We also completed the trackwork across the 'viaduct' which has a horrible air of permanence. I still have to trim the inside of the boards. I love the long gentle curve, something that you can only really get outside in this scale.
We also soldered some droppers for the bus and started to bridge the rail panel gaps, so DCC running may even happen this year. Anyway, we are open for visitors, so PM me if you are interested.
Cheers,
Richard