Compton castle
Western Thunderer
All go on the new coaling stage project, Intentio Pit in and railed up plus the first track going down, front road will have a long pit installed before the track is fixed.
I picked up two lengths of Peco for the rear road from the Pontypool and Blaenavon Railway shop along with a box van yesterday, I did respace the first 8” to match the C&L track as it’s visible but the rest is hidden behind the coaling stage and the ramp! Plus some laser cut sleepers in place for the Ragstone buffer stop. Polystyrene added in the corner.
I picked up two lengths of Peco for the rear road from the Pontypool and Blaenavon Railway shop along with a box van yesterday, I did respace the first 8” to match the C&L track as it’s visible but the rest is hidden behind the coaling stage and the ramp! Plus some laser cut sleepers in place for the Ragstone buffer stop. Polystyrene added in the corner.