Update on LoveLane, John B, John W, Steve, Sopwith, Jim, Tim, myself and our Host PJH all attended the baseboards side and grappled with the tools.
The loco ash pit has been removed and the hole repaired and track relaid, it now awaits re-fitting in the loco spur. Fishplates are being fitted aswell as point operating units and linkages under the boards.
The trap points have beeen laid in the loco spur as previously mentioned by John B ( OZ7mm) earlier but also on the down road protecting the single line that comes in from the country end.
Quite humid in the shop front at Friars St.
Col.
Above, top spur is the down road trap and will feature a sand drag ( photo's wanted please). The other trap point is in the loco spur.
General mahem in the shop with one board in the cradle and turned upside down for ease of access when working on wiring etc.
A sample of point linkages and motors ( Conrad)
ATB, Col.