Shelton Bay
Active Member
Most of the ballasting has been done, waiting for it to dry now. The platform track will be done after the platform itself is completed and fixed down (after checking and double checking clearances, then check again).
I roll the DAS until it's about 1mm thick, then glue is down with a thin layer of PVA and use an old paintbrush ferrule to press the setts into it. I use a nylon stencil brush to stipple the surface before the clay fully dries.How did you emboss the stone setts into the Das clay?
Terry
The coaches are shortened Peco Lynton & Barnstaple coaches. I replaced the slot in solebar running boards with "I" section Evergreen styrene.and can I ask the origins of the two coaches please.
Tony