Modelling on a £1200 table.
Just a little update (no pictures as yet but ill get around to it)
Both sides of the floor framework are now complete and ready for the flooring. . Going to add 2 extra double socket outlets 1st then I'll start with the floor. . Once that's done I'll have a safe platform to work from to insulate the rafters, plan to use bubble foil don't know if I mentioned that earlier in this thread? Think its going to be much easier/quicker than kingspan.. it simply staples on and you tape the joins with foil tape, over this I'll fix tanalised roof latting and to that the plasterboard. .
Happy days. .
Ross..
Both sides of the floor framework are now complete and ready for the flooring. . Going to add 2 extra double socket outlets 1st then I'll start with the floor. . Once that's done I'll have a safe platform to work from to insulate the rafters, plan to use bubble foil don't know if I mentioned that earlier in this thread? Think its going to be much easier/quicker than kingspan.. it simply staples on and you tape the joins with foil tape, over this I'll fix tanalised roof latting and to that the plasterboard. .
Happy days. .
Ross..