As the Thread Over There about this layout was revived recently by the interest of new members, I mught as well take the chance to update this old thread Here, as Withyn Reach is still very much alive and well

Still unfinished

... but alive and well...
A couple of pics of the new fiddleyard arrangement. As the original intention was to use single cassettes, I didn't line up the ends of the track on the scenic board, which meant needing a short bit that brings them parrallel to use a traverser. Although this is a waste of hidden siding space, it does lengthen the on-scene capacity a bit (every cloud, etc)
My lad liked the Ixion Hudswell-Clarke, and I'm a soft touch, so we traded in some HO locos for one...
Now the general idea of the typical movements/sequence for the exchange of trains between B.R. and the Private Railway (as yet still un-named

)
We start with the Barclay waiting on the old Wharf with an 'Outbound' train, two empty vans and a 16t of scrap metal.
I do hope (having not researched it!!) that the Barclay weighs less than 50 Tons..!!!
As glimpsed in the previous photo, the Hymek has arrived with a couple of inbound wagons, a 16t of coal and empty Tube Open for a collection, and Brake Van.
It runs round the train, collects the Brake Van, and returns to the headshunt behind the hut. Brew time for the Crew
The Barclay leaves the outbound train and collects the inbound wagons. It then returns to the outbound wagons and pulls them forward clear of the weight restriction, so the Hymek can get them. I know it
could do this before collecting the inbounds, but it's extra movement, and based on the assumption that 'offstage' the loop is rather short, and the crossover in favour of the BR tracks to the rear; in other words, to go to the rest of the private system, the Barclay
has to leave from the front track, if that makes sense...
You'll note that the outbound train is dropped on the point. Real railways seem to block up pointwork like this far more than modellers do!
The Hymek leaves the Brake Van in the headshunt, and comes around to collect the outbound wagons. (Fitting the etched numbers is yet another "Still to Do" job!!)
It then goes back on the rear track to collect the Brake Van, and makes ready for departure.
... and thus Withyn Reach returns to the peace and quiet of a little-used & nearly closed freight branch.
For Exhibition, I would bring the Barclay back on scene with another 'outbound' train, before the B.R. train leaves, so there's always something on view.
Finally, Withyn Reach has a couple more residents (Omen Miniatures); a Shunter has joined Old Bert, and a Goods Guard watches from the verandah of a Lima Toad (which rather embarassingly has lost a lamp iron, and has a broken lower handrail; close-ups are SO cruel

)...
For now, that's all, folks!!!