Just realised I haven't reported in for almost 3 years!!!!! Well the bad news is that we still haven't finished the run of 5 production locos but we are not far away. There are now boxes and boxes of machined and fabricated parts but the main delay at the moment is the Brass etch sheets which should arrive any day.
The Steel laser cuts have all been cut out, machined, drilled and reamed where necessary, and assembled. Here is an example:
25 Eccentric straps.
Coupling rods being fluted:
Boilers built and hydraulically tested (only 4 as the prototype will provide the fifth):
:
And a host of items fabricated in Brass. For example Buffer stocks (not yet washed to remove oil and swarf:
I will try and post more regularly in future. It definitely will not be another 3 years!!