So I think it's as big as it's going to get, barring the small extension for the Gents toilet on the Axbridge end. Good progress this weekend. Ranges are now in place and I've added the recessed gable end detail that somehow I forgot to draw in Corel and get laser cut.
I trial filled the mortar courses with ready mix filler on the internal side of the southern wall, which will be nearest the viewing audience. I think it's worked well at filling the gap around the window ashlar frame too. I'll almost certainly do this for the rest of the structure. All the embossed stone sheet is now on, including the wall to the north side of the shed which also doubles as the building wall. Trial fitted some oversize foam sheet to one of the platform faces. This will have some form of paving sheet added and be cut back to mirror the platform face.
A few days away with work will give me the opportunity of drawing up the corner quoin details on Coreldraw. I intend to have these cut in card to wrap around the corner joins. Must check the internal dimensions now and adjust the drawing for the internal footbridge if necessary.
I'm taking a couple of boards to the EMGS AGM in Cardiff on 30 November and plan to take both the goods shed and station in whatever state it's got to.