Patients is a virtue but this build is really taxing my patience
![Headbang :headbang: :headbang:](/styles/default/xenforo/smilies/banghead.gif)
.
The cab has been finished with the roof ventilator in place and the cab doors fitted, unfortunately the latter will have to be raised slightly as they catch on the tender fall plate. The cab profile on Seven Models kits is incorrect and is too flat. I'm considering trying to rectify this but currently it is on the too difficult list to do!
When detailing a loco I start from the smokebox and try to work back to the cab, first on the driver's side and then the fireman's. Early in the build the instructions say to fit the etched steampipe covers, this resulted in an unsightly gap between it and the casting on the smokebox, also the long whitemetal casting for the steampipe to the preheater would not fit into the recess on the boiler. Out came the gas gun and the etched casing was moved forward and in towards the boiler, the steampipe now fits in place and there is only a small gap to fill. With this hurdle passed I could start on the brake ejector valves which also meant I had to install the manifold to get the pipework correctly positioned. Originally I used 0.5mm copper wire for the pipes for the brakes but this was too small and I have substituted 0.8mm brass wire. The delivery pipe to the clack was formed up and I used some heat shrink material to replicate the thick lagging around it.
![Loco 15 231114.JPG Loco 15 231114.JPG](https://www.westernthunder.co.uk/data/attachments/38/38543-2d79805fea21853c87b5c38ce31fd90a.jpg)
The only detail to install on the driver's side is the regulator rod, reverser, the drain cock valve and vacuum brake pipework under the cab.
![Loco 17 231114.JPG Loco 17 231114.JPG](https://www.westernthunder.co.uk/data/attachments/38/38544-b13a05b30d81b83365b9d3c4af6b52d5.jpg)
On the fireman's side detailing of the delivery pipes to the clacks has been finished, steps up to the chimney and associated handrail have been installed as has the steam lance valve and its pipework. There is much to do on this side not least the injectors and "Titanic funnel" which will take most of the coming week to build.