It has been sometime since my last post. I just have not had time to get to the bench. It all started back in March when mother in law sadly passed away. since then we have built an extension on the house moved and our adopted son arrived a month ago, being just 2 days old at the time he takes a bit up a bit of our time.
I am finally finding odd minutes to sit at the bench, and if I do not spend to much time pondering I can actully do something.
Back to the S15.
Poor state of affairs when I sat back at the bench after clearing the accumilated clutter. First of all I had not put the loco away as last time there I was going back next day.
Well, while refreshing my mind about where I had got to. I found I was not only missing the ash pan, but the left hand union link I was remaking had gone, along a return crank, broken valve rod.
I restarted work by making the missing and broken parts. I also re did a couple of joins on the right hand side to matchthe better method used on the left.
Heres the right side modified.
The left side completed. All looking good.
I also fited themotor for testing. I think itis a MSC crailcrest and JH gearset. I did add some bushes to it to give more bearing surface. Plus it all fits into the firebox nicely.
I have now taken the motion off the frames so I can finish detailing them, while I work out what I need to add I went back to the body. I made and fitted the washout plugs none in kit. The holes for which were in the wrong place. I assume the boiler had been pre rolled inside out. This meant I needed to fill the existing and drill new ones. Not hard to do just a pain as it was unnecessary if rolled the right way
That's it for now. It has taken me a week to do this little bit.