4mm Llanfair ....

LarryG

Western Thunderer
My place of work 1971 - 1986 ...

It was a good solid shed bought for me by the missus, who placed faith in me building up the painting & lining business. The end window was a fully working droplight removed from an LNWR Toplight coach along with the louver and door handles. My youngest son decided it would be a good place to sleep one night, but he didn't have the strength to pull the leather strap to close the window when it got cold in the night.... :D
WEB Workshed .jpg

Removing a door. The scrap men were very accommodating and even gave me a surprise Mansell wheel off its axle for my garden! It was embarrassing to have to decline ...
WEB Camping coach 1.jpg
 
Last edited:

LarryG

Western Thunderer
Connoisseurs of wood planks will love his :D. Un-planed timber from the aborted garden loop was used to bridge the gap between the scenic board and fiddle yard. It's been sanded but I'm hoping undulations will be more easily ironed out when the cork is in place. Saves buying expensive ply from B&Q...

WEB Llanfair new 17B.jpg WEB Llanfair new17A.jpg
 

LarryG

Western Thunderer
Staying with the new connecting board, 1/8" cork was laid and sanded down to match cork on LH and RH baseboard. A length of wood was temporarily screwed to its centre and a length of extruded coach roof was used as a compass. 30" radius turned out to be too large and so slightly over a 28" radius will be laid here...

WEB Llanfair new 17C.jpg

I could have used a larger radius on the scenic board and 24" off stage, but I was considering locos with front steps ~ hence a complete arc of 28"radius.....
WEB Llanfair new 17D.jpg

The goods yard headshunt was in the wrong place (ugh), so it was lifted and new cork laid for a clean start when laying track tomorrow....
WEB Llanfair new 17E.jpg
 
Last edited:

LarryG

Western Thunderer
This layout is evolving as it slowly progresses and one bugbear was the bottom corner. I didn't want to see trains on the sharp curve! However, I started off by shaping some rough timber with a jigsaw as a basis for an embankment....

WEB Llanfair new 19A.jpg

I discovered that if I used the slightly sharper Set Track curves, there was room to insert an almost straight section under the bridge. Signs of the original curve are visible on the baseboard .....
WEB Llanfair new 19B.jpg

The shot below gives a better idea of the modifications. I'm currently awaiting Code 100 track and turnouts for the fiddle yard. The Hornby Riddles 2-6-0 negotiates the Set track curve without fouling the front steps. All the Code 100 will be pinned down to give much quieter running...
WEB Llanfair new 19C.jpg

Track level view to see how things will look ...
WEB Llanfair new 19D.jpg
 

LarryG

Western Thunderer
This was the scene 4 years ago showing Llanfair's embryo in November 2020, and in 0 gauge too...! It was a mirror-image of Llanfyllin back then, but the station been at the brightest end of the shed ever since...

WEB Llanfair original 1.jpg

Positioning the road bridge closer to the station has made the scene more compact, so from now on construction should be straightforward...
WEB Llanfair new 19E.jpg
 

LarryG

Western Thunderer
Half the Code 100 curve to the fiddle yard has been glued down, ballasted and weathered. From hereon, the track will be pinned seeing as it is outside the scenic section. Even when glued and ballasted, running is noticeably quieter on the Code 100 than it is on the Bullhead. Dunno why. Scene with the bridge removed....
WEB Llanfair new 19F.jpg

Scene with the scenic break bridge in place
WEB Llanfair new 19G.jpg

Embankment formers for the Vinyl grass sheet. It was pure good fortune that the backscene mismatch ended up behind the bridge....
WEB Llanfair new 19H.jpg
 
Last edited:
Top