I've changed the original title. Now I've studied an MMP coach kit build, and had a good look inside the box, I feel happy I can do this kit some justice.
I plan to begin building just after the new year kicks in, once the LNWR coaches I'm finishing are more or less complete - they're not too far off, but I have a habit of counting my chickens and missing by a fair whack! The start date is sooner than my original prediction, but I plan to interleave two builds, the other being a JLTRT 57xx pannier tank. Two builds on the go will hopefully stop me getting bogged down if something causes me frustration in one kit or another.
Today, I have been getting some intensive detail picking in. There's a
virtually forensic photo study of S1840 on the Mid Hants Railway over on Flickr, which has some useful information in it. I need to see if I can find a preserved RMB with ETH and dual braking, which could lead to some fun! I shall shortly send Richard an outline of the build so we can properly confirm the actual details he would like.
I am now really wishing I could get the coach-building pixies to hurry up and complete the current build so I can get on with this one!
![ROFL :)) :))](/styles/default/xenforo/smilies/roflmao.png)